User's Manual
Table Of Contents
- Installation and Operation Manual
- Tait Contact Information
- Contents
- Preface
- 1 Introduction
- 2 Mechanical Description
- 3 Functional Description
- 4 Installation
- 5 Replacing Modules
- 5.1 Removing the Base Station and Opening the Tray
- 5.2 Replacing the UI Board
- 5.3 Replacing the Receiver Module
- 5.4 Replacing the Transmitter Module
- 5.5 Replacing the SI Board
- 5.6 Replacing the Transmitter and Receiver Fans
- 5.7 Replacing the Fan Power Board
- 5.8 Replacing the Temperature Sensor Board
- 5.9 Replacing the AC Power Supply Unit, Fan and Filter Module
- 5.10 Replacing the Speaker
- 5.11 Final Reassembly
- 6 Connections
- 7 Preparation for Operation
- 7.1 Introduction
- 7.2 Mode of Operation
- 7.3 Line-controlled Base
- 7.4 Talk Through Repeater
- 7.5 RF Modem
- 7.6 Data Repeater
- 7.7 TaitNet Trunking
- 7.8 Programmable Features
- 7.9 Additional Settings
- 7.10 Adding Subaudible Signalling
- 7.11 Soft Off (Tx Tail Time)
- 7.12 Tone On Idle (TOI)
- 7.13 Fan Operation
- 7.14 Channel ID
- 7.15 Relay Polarity
- 7.16 Channel Increment and Decrement by Function Keys
- 7.17 Carrier Wave Identification (CWID)
- 8 Maintenance Guide
- Glossary
- Tait General Software Licence Agreement
- Directive 1999/5/EC Declaration of Conformity
TB7100 Installation and Operation Manual Preparation for Operation 79
© Tait Electronics Limited December 2005
■ audio level meter
■ audio signal generator.
Calibration Test Unit
(CTU)
The CTU is used to configure and test the base station. The same CTU is
used for TB8000 and TB9000 base station equipment, so only some of the
features on the CTU apply to the TB7100 base station. The CTU adaptor
is plugged into the system connector of the CTU. The CTU cable is
plugged into the system connector of the base station.
For more information on the CTU refer to the TBA0STU/TBA0STP
Calibration and Test Unit Operation Manual (MBA-00013-xx).
7.3.2 Test Equipment Setup
1. Connect the PC to the programming port on the front panel of the
base station. See “Connecting to the PC” on page 105.
2. Plug the adaptor into the system connector on the CTU. Connect the
adaptor cable to the system connector of the base station.
Note Connections between the CTU and the test equipment will vary
and are described in the relevant test steps.
3. Ensure all switches on the CTU are in the 1 or OFF position
(inactive).
4. Connect the receiver N-type connector to the RF test set (signal
generator) output port.
5. Connect the transmitter N-type connector to the RF test set (power
and modulation meter) input port, check the test set is rated for the
transmit power of the base station.
6. Connect the 13.8V power supply to the DC input on the base station,
ensuring correct polarity.