Installation Guide

Table Of Contents
INSTALLATION STEPS
INSTALLATION STEPS
BEFORE INSTALLATION
1.Check the package and confirm all parts are included. If any part is missing or damaged, please contact
us.
2.Do not disassemble the main body, as it has been installed & commissioned correctly & precisely before
leaving the factory.
3.Shut off the main water supply prior to beginning installation.
4.Do flush the water supply lines to remove any dirt and debris before installation (IMPORTANT).
5.Make sure to connect the hot / cold inlet pipe correctly. If standing in front, connect hot water pipe to the
left and cold water pipe to the right.
6.After the installation, check for leaks and make sure every joint is safely sealed.
INSTALLATION STEPS