GENIOX VOCLEAN IOM

16 Installation
Note! Never - place the strap on the vertical prole when a section is pulled along the base frame or on the oor.
Note! Place the strap on the bottom proles of the unit to avoid any load and stress on the vertical proles when sections are
pulled together along the base frame or on the oor. The sections must be pulled fully and tight together with the strap placed on
the bottom proles.
Figure 11. Lifting with Rope from Base Warning
Figure 12. Base Frame Mounting
Sectionsaremountedtobaseframeswithself-drillingscrews.Inthebaseframeyouwillndasufcientnumberof5mmholes
that are prepared for the self drilling screws. In this picture you are standing and you are watching the assembled base frame on
theoororroof.
Useself-drillingscrews-4,8X18mm-tobescrewedupwardthroughtheholesintothebottomproleoftheairhandlingunit
Note!Ascrewmustbeplacedineveryholetoachievethenecessarystrength.Inthispictureyouarelyingontheoororroof
looking upward under the base frame. The screws will not be visible, when you are standing beside the unit looking at the unit
The sections must be placed on the base frame and the sections must be positioned directly in line with each other.
Ensurethattheinternalfactory-ttedrubbersealingisundamaged.
H 2.5 Joining the Ecology Unit sections