GENIOX VOCLEAN IOM

14 Instructions for Unloading the Site
H.1.9 Roof unit with PVC
H.1.10 Pre-assembly storage
H.2.1 Free area in front of and above the unit
H.2.2 Supporting surface
AvoiddamagingthedripnoseprolesalongthePVC.KeeptheprotectionprolesofStyrofoamontheunituntiltheinstallationhas
beencompleted.Iftheunitisliftedbystraps,thestrapsmustbekeptawayfromthedripnoseprolesbybarstoavoiddamageto
roongproles.
The Ecology uint must be protected from the weather and accidental impact. Plastic packaging must be removed and the unit
coveredwithtarpaulinorsimilarmaterials.Inordertominimizecondensation,sufcientaircirculationmustbeensuredbetween
the covering and the unit.
Figure 8. PVC Roof
Figure 9. Forklift Lifting Warning
H.2 Installation - mechanical
IMPORTANT
When positioning the unit on the site, it must be ensured that an area with the same width as the unit is kept free for
service and inspection and also for replacement of fans and exchanger, if needed. The width of the free area must be at
least 900 mm.
IMPORTANT
For safe access to the cabinet with electrical components, if the cabinet is placed on top of the unit, the free area from
the upper edge of the cabinet to the ceiling must be at least 700 mm.
CAUTION
Duct work must be sound insulated and must not be mounted directly on beams, trusses or other critical building parts.