Geniox User Manual Hygienic air handling unit

Table Of Contents
Adjustment and maintenance operations |
47
R.3 Checklist with schedules about cleaning and repair
Row Item
Activity
Action if required
1 3 6 12 24
month months
0
Hygiene inspection
1
Outdoor-air inlets and exhaust-air outlets
1.1
Check for contamination,
damage and corrosion.
Clean and repair
X
1.2
Check environment for new
emission sources.
Inform operator
2
Decentralised air-handling units/terminal units. Geniox units are central air handling units and not
decentralised units. This item of the checklist is omitted
3
Dehumidifiers
3.1
Check for contamination,
damage, corrosion and
droplet penetration.
Clean and repair
X
3.2
Function-check drain and
drain trap.
Repair.
X
3.3
Clean wet cooler, droplet
eliminator and condensate
tray
X
4
Central air handling units/unit casings
4.1
Check for air-side
contamination , damage and
corrosion.
Clean and repair.
X
4.2
Check for condensation Clean.
X
4.3
Check empty casings for
contamination, damage and
corossion.
Clean and repair.
X
5
Static-cooling components
5.1
Check functioning and
condition of any condensate
trays and condensate drains
Clean and repair.
X
5.2
Check dew point sensors,
supply pipes, control circuits
and control valves for leaks.
Repair.
X
6
Air humidifiers
output |