Geniox User Manual Hygienic air handling unit

Table Of Contents
output |
Detailed table of contents on the following pages
General description
A Manufacturer
B Name of machines
C Declaration of Conformity - example
D General descriptions, dangers and warnings
E Drawings, diagrams, guides and instructions for the use, maintenance and repair
F Employees in charge of operation/control/maintenance
G Intended use and range of applications
H Unintended use and misuse inappropriate applications for the machine
Installation
I Instructions for unloading on the site as well as installation and connection
J Installation and assembly instructions for reduction of noise and vibration emissions
Start-up, adjustments and operation
K Start-up, adjustments, use, commissioning and unit in out of regular operation for several months
L Information about the residual risks
M Instructions on the protective measures during repair and maintenance
N The essential characteristics of tools which may be fitted to the machinery
Machine stability
O The conditions of stability during use, transportation, assembly, dismantling when out of service
P Instructions for machinery where these are regularly to be transported
Breakdown
Q The operating method to be followed in the event of breakdown. Safe restart.
Maintenance
R Adjustment and maintenance operations
S Instructions to enable adjustment and maintenance safely
T The specifications of the spare parts to be used, when these affect the health and safety of operators
Noise
U Information on airborne noise emissions exceeding 70 dB(A)
Annexes
1 Declaration of conformity with production number (in separate cover)
2 Technical data unique data for every unit (in separate cover)
3 Spare part list (in separate cover is only available on demand)
4 Speed control for rotary heat exchanger
5 Reversible heat pump unit (in separate cover, if heat pump was delivered)
6 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was delivered)
7 Connection of EC fan motor, diagnostics/faults and configuration of speed control
8 Commissioning protocol proposal (in separate cover)
9 Report with data from final functional test on the Systemair factory (in separate cover)
10 Short description of main components in the control system
11 Wiring diagram (in separate cover)