Geniox user manual

Table Of Contents
output | 11
Contents
9.8 Foam bands between roof plates .............................................................................................9-7
9.9 Mount roof plates some of them are overlapping by 2 ribs...........................................................9-8
9.10 Mount overhang profile G5 on the other end of the unit ..............................................................9-8
9.11 Mount side profiles and corners along the edges of the roof to protect persons..................................9-8
9.12 Apply sealing on plate joints to ensure water resistance................................................................9-9
Annex 10 Speed control for rotor and assembly of divided rotor ................................................................ 10-1
10.1 Speed control RHC 200 delivered before March 2021 ................................................................. 10-1
10.1.1 Selection of correct signal via the 8DIP switch levers for RHC 200 delivered before March
2021 ................................................................................................................... 10-1
10.1.2 Indication of operation mode via red and green LED as well as test of motor for RHC 200
delivered before March 2021.................................................................................... 10-2
10.1.3 Information about connection of cables to terminals on the control board in RHC 200
delivered before 2021 ............................................................................................. 10-3
10.2 Speed control type NOVA drive 370 delivered after February 2021 ............................................... 10-4
10.2.1 Selection of correct signal via the 5 DIP switch levers in NOVA drive 370 ............................ 10-4
10.2.2 The board in NOVA drive 370 for control of revolutions. .................................................. 10-7
10.2.3 Information about connection of cables to terminals on the control board............................ 10-8
10.2.4 Modbus control for NOVA drive 370 ........................................................................... 10-8
10.2.5 Modbus control Normal operation ........................................................................ 10-10
10.3 Assemble divided rotor and the Systemair casing .................................................................... 10-10
10.4 Assemble divided rotor from Hoval....................................................................................... 10-11
10.4.1 Tools and aids...................................................................................................... 10-11
10.4.2 Lifting instruction for upper half of the Hoval CDS 290 mm rotor casing ............................ 10-11
10.4.3 Installation of upper half of the Hoval CDS 290 mm rotor casing...................................... 10-12
10.4.4 Installation of radial walls between segments ............................................................. 10-13
10.4.5 Adjusting clearance between radial walls and the casing ............................................... 10-13
10.4.6 Installation of rotor segment and periphery plates ....................................................... 10-14
10.4.7 Installation, first periphery plate............................................................................... 10-15
10.4.8 Installation of next segment.................................................................................... 10-16
10.4.9 Installation, next periphery plate .............................................................................. 10-17
10.4.10 Final adjustment of segments and periphery plates...................................................... 10-17
10.4.11 Installation of brush sealing and upper half of the Systemair casing.................................. 10-18
10.5 Assemble divided rotor from Lautner .................................................................................... 10-20
10.5.1 Tools and aids...................................................................................................... 10-20
10.5.2 Assembly instructions............................................................................................ 10-21
10.6 Assemble divided rotor from Klingenburg............................................................................... 10-32
10.6.1 Tools and aids...................................................................................................... 10-32
10.6.2 Assembly instructions............................................................................................ 10-32
10.6.3 Adjusting the bearings........................................................................................... 10-36
10.6.4 Installing back plates and tensioning belts.................................................................. 10-36
10.7 Installation of motor that turns rotor and sensor for control of rotation ......................................... 10-40
Annex 11 Reversible heat pump unit (in separate cover, if heat pump was delivered) .................................... 11-1
11.1 Geniox-HP section (reversible heat pump unit) ......................................................................... 11-1
Annex 12 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was
delivered) .................................................................................................................................... 12-1
Annex 13 Connection of fan motor and set-up manual for frequency converter............................................. 13-1
13.1 Connection of fan motor ...................................................................................................... 13-1
13.2 Set-up for Danfoss FC101 for Geniox-units with AC motors.......................................................... 13-1
13.3 AC-fan operation without thermistor for Danfoss FC101.............................................................. 13-2
13.4 Installation ECblue .............................................................................................................. 13-4
13.4.1 Connection............................................................................................................ 13-4
13.4.2 Diagnostic/faults .................................................................................................... 13-5
Annex 14 Commissioning protocol proposal (in separate cover)............................................................... 14-1
Annex 15 Report with data from final functional test on the Systemair factory (in separate cover, if control
system was delivered) .................................................................................................................... 15-1
Annex 16 Short description of main components in the control system ....................................................... 16-1
16.1 Geniox units delivered in several sections ................................................................................ 16-1
16.1.1 External components............................................................................................... 16-1
16.2 Geniox unit delivered assembled on base frame ........................................................................ 16-1
16.2.1 External components............................................................................................... 16-1
Annex 17 Wiring diagram (in separate cover, if control system was delivered).............................................. 17-1
Annex 18 Geniox Air Handling Units Sustainability ............................................................................... 18-1
18.1 Illustrations and explanations ................................................................................................ 18-4
18.1.1 Photo A................................................................................................................ 18-4
18.1.2 Photo B................................................................................................................ 18-4
18.1.3 Photo C ................................................................................................................ 18-5