Geniox GO User manualv7.2
Table Of Contents
- A Manufacturer
- B Name of machines
- C Declaration of Conformity
- D General descriptions, dangers and warnings
- E The control panel for the control system.
- F Drawings, diagrams, guides and instructions for the use, maintenance and repair
- G Employees in charge of operation/control/maintenance
- H Unintended use and misuse – inappropriate applications for the machine
- I Instructions for unloading and handling on site
- J Installation
- J.1 Installation - mechanical
- J.1.1 Free area in front of and above the unit
- J.1.2 Supporting surface
- J.1.3 Adjustable feet under legs or base frame and transport of sections
- J.1.4 Base frame assembly
- J.1.5 Base frames for outdoor units
- J.1.6 Outdoor units — support under the base frame of the unit
- J.1.7 Installation on the site of unit sections at the base frame when sections are delivered on pallets
- J.1.8 Joining the unit sections
- J.1.9 Fitting the ductwork
- J.1.10 Risk of stack effect by vertical ducts and wind pressure on louvers
- J.1.11 Door alignment
- J.1.12 Lock the doors by using the key
- J.2 Installation - electrical
- J.3 Installation – Pipes for water – hot and chilled, valves and drains
- J.1 Installation - mechanical
- K Installation and assembly instructions for reduction of noise and vibration emissions
- L Start-up, adjustments, use and commissioning
- M Information about the residual risks
- N Instructions on the protective measures during repair and maintenance
- O The essential characteristics of tools which may be fitted to the machinery
- P The conditions of stability during use, transportation, assembly, dismantling when out of service
- Q Instructions for machinery where these are regularly to be transported
- R The operating method to be followed in the event of breakdown. Safe restart.
- S Adjustment and maintenance operations
- T Instructions to enable adjustment and maintenance safely
- U Information on airborne noise emissions exceeding 70 dB(A)
- Annex 1 Technical data – unique data for every unit (in separate cover)
- Annex 2 Assembly of base frame – height 118 mm for unit sizes 10 – 18
- Annex 3 Assembly of base frame – height 118 mm for unit sizes 20 – 27
- Annex 4 Assembly of base frame – height 218 mm for unit sizes 10 – 18
- Annex 5 Assembly of base frame – height 218 mm for unit sizes 20 – 27
- Annex 6 Installation of steel roof in the sizes 10 – 31
- Annex 7 Speed control for rotor and assembly of divided rotor
- Annex 8 Reversible heat pump unit (in separate cover, if heat pump was delivered)
- Annex 9 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was delivered)
- Annex 10 Connection of fan motor and set-up manual for frequency converter
- Annex 11 Commissioning protocol (in separate cover)
- Annex 12 Report with data from final functional test on the Systemair factory
- Annex 13 Short description of main components in the control system
- Annex 14 Wiring diagram (in separate cover)
- Annex 15 Operator’s guide (How to use the Systemair control panel) (in separate cover)
211728 | v7.2
Contents
6.1.3 Mounting roof side profiles and corners.......................................................................... 68
Annex 7 Speed control for rotor and assembly of divided rotor ..................................................................... 68
7.1 Speed control type NOVA drive 370 delivered after February 2021 .................................................. 68
7.1.1 Selection of correct signal via the 5 DIP switch levers in NOVA drive 370 ............................... 69
7.2 Speed control RHC 200 delivered before March 2021 .................................................................... 75
7.2.1 Selection of correct signal via the 8 DIP switch levers ........................................................ 75
7.2.2 Indication of operation mode via red and green LED as well as test of motor........................... 75
7.2.3 Copy of the label with information about connection of cables............................................. 76
7.3 Assemble of split rotor for Geniox GO 27, Geniox GO 29 and Geniox GO 31 ........................................ 77
7.3.1 Dimensions of split rotor sections.................................................................................. 77
7.3.2 Assemble of rotor casing............................................................................................. 78
7.3.3 Installation of rotation sensor, rotor magnet and belt......................................................... 80
Annex 8 Reversible heat pump unit (in separate cover, if heat pump was delivered) ......................................... 81
Annex 9 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was
delivered) ....................................................................................................................................... 82
Annex 10 Connection of fan motor and set-up manual for frequency converter................................................ 82
Annex 11 Commissioning protocol (in separate cover)................................................................................ 82
Annex 12 Report with data from final functional test on the Systemair factory................................................. 82
Annex 13 Short description of main components in the control system .......................................................... 82
13.1 Geniox units delivered in one or several sections ......................................................................... 82
13.1.1 External components.................................................................................................. 82
Annex 14 Wiring diagram (in separate cover) ........................................................................................... 82
Annex 15 Operator’s guide (How to use the Systemair control panel) (in separate cover)................................... 82