Geniox GO User manualv7.2
Table Of Contents
- A Manufacturer
- B Name of machines
- C Declaration of Conformity
- D General descriptions, dangers and warnings
- E The control panel for the control system.
- F Drawings, diagrams, guides and instructions for the use, maintenance and repair
- G Employees in charge of operation/control/maintenance
- H Unintended use and misuse – inappropriate applications for the machine
- I Instructions for unloading and handling on site
- J Installation
- J.1 Installation - mechanical
- J.1.1 Free area in front of and above the unit
- J.1.2 Supporting surface
- J.1.3 Adjustable feet under legs or base frame and transport of sections
- J.1.4 Base frame assembly
- J.1.5 Base frames for outdoor units
- J.1.6 Outdoor units — support under the base frame of the unit
- J.1.7 Installation on the site of unit sections at the base frame when sections are delivered on pallets
- J.1.8 Joining the unit sections
- J.1.9 Fitting the ductwork
- J.1.10 Risk of stack effect by vertical ducts and wind pressure on louvers
- J.1.11 Door alignment
- J.1.12 Lock the doors by using the key
- J.2 Installation - electrical
- J.3 Installation – Pipes for water – hot and chilled, valves and drains
- J.1 Installation - mechanical
- K Installation and assembly instructions for reduction of noise and vibration emissions
- L Start-up, adjustments, use and commissioning
- M Information about the residual risks
- N Instructions on the protective measures during repair and maintenance
- O The essential characteristics of tools which may be fitted to the machinery
- P The conditions of stability during use, transportation, assembly, dismantling when out of service
- Q Instructions for machinery where these are regularly to be transported
- R The operating method to be followed in the event of breakdown. Safe restart.
- S Adjustment and maintenance operations
- T Instructions to enable adjustment and maintenance safely
- U Information on airborne noise emissions exceeding 70 dB(A)
- Annex 1 Technical data – unique data for every unit (in separate cover)
- Annex 2 Assembly of base frame – height 118 mm for unit sizes 10 – 18
- Annex 3 Assembly of base frame – height 118 mm for unit sizes 20 – 27
- Annex 4 Assembly of base frame – height 218 mm for unit sizes 10 – 18
- Annex 5 Assembly of base frame – height 218 mm for unit sizes 20 – 27
- Annex 6 Installation of steel roof in the sizes 10 – 31
- Annex 7 Speed control for rotor and assembly of divided rotor
- Annex 8 Reversible heat pump unit (in separate cover, if heat pump was delivered)
- Annex 9 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was delivered)
- Annex 10 Connection of fan motor and set-up manual for frequency converter
- Annex 11 Commissioning protocol (in separate cover)
- Annex 12 Report with data from final functional test on the Systemair factory
- Annex 13 Short description of main components in the control system
- Annex 14 Wiring diagram (in separate cover)
- Annex 15 Operator’s guide (How to use the Systemair control panel) (in separate cover)
Start-up, adjustments, use and commissioning |
27
L.2.1 Remove rotor lock plate
Before starting the unit remove the rotor wheel lock plate.
L.2.2 Checklist, relevant values
L.2.2.1 Checklist prior to start-up
• Is the unit assembled correctly with its functions in the correct order?
• Are the sections and ducts assembled correct?
• Check that fans and anti-vibration mounts are not damaged after transportation and installation.
• Is the rotary exchanger turning freely?
• Are doors locked?
• If the unit includes integrated heat pump, check whether it is installed and supervised by qualified service personnel.
• If the unit contains Electric air heater, make sure that the supply isolator disconnects with the unit.
• Are valves and valve motors installed correctly?
• Is the circulation pump installed correctly?
• Is water under pressure in the coil and circulation pump?
• Are the pressure transmitters installed and connected correctly? (If this is a system with pressure transmitters in the
ducts)
• Main power supply:
• Connected correctly?
• Test of supply voltage for actuators and control signal!
• Are control signals for actuators connected correctly?
L.2.2.2 Switch on power
Warning
Do not start until all safety procedures have been completed and ensure that inspection doors are closed
and locked.
Switch on power and the unit should be ready for the start-up.
211728 | v7.2