Geniox GO User manualv7.2

Table Of Contents
22
| Installation
J.2 Installation - electrical
J.2.1 Installation of cable sealing boxes (only in rotor sections of Geniox GO 27—31)
In rotor sections of Geniox GO 27 —31 installers must
assemble 4 cable sealing boxes. All required parts are
included in accessories.
Part.
No.
Name Notes
1.
Cable connector Connectors are factory preinstalled.
2.
Cable Cables are factory preinstalled. During
installation, cables must be routed through
lower and upper section panels (pos. 6) .
3.
Cable-through
sealing element
Cable-through sealing elements are factory
preinstalled.
4.
Seal holding
plate
Seal holding plates hold cable sealing blocks
(pos. 5) in place. Those plates must be fixed to
the panels using screws (pos. 7).
5.
Cable sealing
block
Foam sealing blocks are used to enclose cables
(pos. 2) and prevent air leakage between
lower and upper sections. To enclose a cable,
first remove a required thickness inner block
tube. Ensure that there is no gap between the
sealant and the cable before fixing it into the
panel.
6.
Bottom panel
of upper
section
Cable sealing blocks must be installed into the
panels (pos. 6 and pos. 7) and fixed with seal
holding plates (pos. 4).
7.
Upper panel of
bottom section
8.
Screws
Screws are used to fix seal holding plates (pos.
4).
J.3 Installation Pipes for water hot and chilled, valves and drains
J.3.1 Description
If ordered with the unit, valves and valve motors are packed in a separate box. Water traps are optional. Water traps
are necessary to prevent outside air coming into AHU via drainage.
J.3.2 Pipe connections
Connection pipes on heating- and cooling coils are provided with external thread.
211728 | v7.2