Geniox GO User manualv7.2

Table Of Contents
211728 | v7.2
Detailed table of contents on the following pages
General description
A Manufacturer
B Name of machines
C Declaration of Conformity
D General descriptions, dangers and warnings
E The control panel for the control system.
F Drawings, diagrams, guides and instructions for the use, maintenance and repair
G Employees in charge of operation/control/maintenance
H Unintended use and misuse inappropriate applications for the machine
Installation
I Instructions for unloading and handling on site
J Installation
K Installation and assembly instructions for reduction of noise and vibration emissions
Start-up, adjustments and operation
L Start-up, adjustments, use and commissioning
M Information about the residual risks
N Instructions on the protective measures during repair and maintenance
O The essential characteristics of tools which may be fitted to the machinery
Machine stability
P The conditions of stability during use, transportation, assembly, dismantling when out of service
Q Instructions for machinery where these are regularly to be transported
Breakdown
R The operating method to be followed in the event of breakdown. Safe restart.
Maintenance
S Adjustment and maintenance operations
T Instructions to enable adjustment and maintenance safely
Noise
U Information on airborne noise emissions exceeding 70 dB(A)
Annexes
1 Technical data unique data for every unit (in separate cover)
2 Assembly of base frame height 118 mm for unit sizes 10 18
3 Assembly of base frame height 118 mm for unit sizes 20 27
4 Assembly of base frame height 218 mm for unit sizes 10 18
5 Assembly of base frame height 218 mm for unit sizes 20 27
6 Installation of steel roof in the sizes 10 31
7 Speed control for rotor and assembly of divided rotor
8 Reversible heat pump unit (in separate cover, if heat pump was delivered)
9 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was delivered)
10 Connection of fan motor and set-up manual for frequency converter
11 Commissioning protocol (in separate cover)
12 Report with data from final functional test on the Systemair factory
13 Short description of main components in the control system
14 Wiring diagram (in separate cover)
15 Operator’s guide (How to use the Systemair control panel) (in separate cover)