USER MANUAL DV WITH CONTROLLER VERSION 1.01.13 90925372

24
i.Instructionsforunloadingonthesiteaswellasinstallationand
connection
i.1.Unloadingonthesite
TheairhandlingunitAHU‐isdeliveredasonesectionorinseveralsections,whicharetobeassembled
onsite.TheAHUisdeliveredontransportpallets,legsoronabaseframe.Loadingandunloadingaswellas
transportonthesiteispossiblebyforklifttruck
orbycraneusingsuitableliftingstraps.
i.1.1Unloadingbyforklifttruck
TheforksofthetruckmustbesufficientlylongtoavoidanydamagetotheAHUunderside.
i.1.2Unloadingbycrane
AHUdeliveredontransportpalletmustbeliftedbystrapsasshownintheillustration.

AHUdeliveredwithlegsmustbeliftedbystrapssecuredtothelegsasshownintheillustration.
i.1.3Transportofunitwithoutbaseframeonthesite
Unitswithoutbaseframearealwaysdeliveredinsectionswitheachsectiononapallet.Sectionscanbe
transportedonthesitebyhandmanualforklifts.
i.1.4Liftingaunitwithstraps
Useanappropriateliftingbeamwithasufficientspantoavoidthatthestrapstouchanddamagethedrip
noseprofilesandtheinspectionsidewithhandles,pipesandaccessoriesforexamplemanometers,
cabinets,tabsformeasuringthepressure.
