SYSHRW – Installation Operation Manual (IOM HRW 03 N 13GB)

Table Of Contents
English
617
1196.50
419
151
A
230
349
B
A
230
349
IN LINE BLOWING
(STANDARD CONFIGURATION)
REAR BLOWING
RETURN AIR INTAKE
11SysHrw
11.1. CONNECTION FRAME DIMENSIONS
11.1.1. AIR BLOWING FRAME
11.1.2. RETURN AIR INTAKE FRAME
96 120
A
317 403
B
345 259