IOM SYSAER R32 (IOM SYSAER R32 01 N 2GB)
Table Of Contents
- COUVERTURE PREMIERE IOM AER32 01-EN.pdf
- IOM AER32 01-N-GB_text.pdf
- CONTENTS
- 1. GENERAL RECOMMENDATIONS
- 2. INSPECTION AND STORAGE
- 3. WARRANTY
- 4. PRESENTATION
- 5. CONTENTS Of PACKAGE
- 6. DIMENSIONS
- 7. HANDLING
- 8. TECHNICAL SPECIFICATIONS
- 9. CONFIGURATION OF THE UNIT
- 10. OPTIONS
- 11. INSTALLATION
- 12. HYDRAULIC LINKS
- 13. WIRING DIAGRAM AND LEGEND
- 14. ELECTRICAL CONNECTIONS
- 15. COMMISSIONING
- 16. FINAL TASKS
- 17. IN CASE OF WARRANTY - MATERIAL RETURN PROCEDURE
- 18. ORDERING SERVICE AND SPARE PARTS ORDER
- 19. MAINTENANCE
- 20. TROUBLE SHOOTING
- ANNEXE AER32 01-N.pdf
- COUVERTURE DERNIERE IOM AER32 01-EN.pdf
English
Slings must never touch the unit casing of SYSAER R32.
Caution
The lifting point must suit the unit's centre of gravity.
Caution
12 SYSAER R32
7.3.2. HANDLING BY SLINGING
Lifting is also possible by slinging in four or six sling.
Rings attached rigidly to the unit structure are intended for completely safe handling.
It is essential to use a spreader or spacer so as not to damage the panels and the structure of the machine.