IOM SYSAER R32 (IOM SYSAER R32 01 N 2GB)
Table Of Contents
- COUVERTURE PREMIERE IOM AER32 01-EN.pdf
- IOM AER32 01-N-GB_text.pdf
- CONTENTS
- 1. GENERAL RECOMMENDATIONS
- 2. INSPECTION AND STORAGE
- 3. WARRANTY
- 4. PRESENTATION
- 5. CONTENTS Of PACKAGE
- 6. DIMENSIONS
- 7. HANDLING
- 8. TECHNICAL SPECIFICATIONS
- 9. CONFIGURATION OF THE UNIT
- 10. OPTIONS
- 11. INSTALLATION
- 12. HYDRAULIC LINKS
- 13. WIRING DIAGRAM AND LEGEND
- 14. ELECTRICAL CONNECTIONS
- 15. COMMISSIONING
- 16. FINAL TASKS
- 17. IN CASE OF WARRANTY - MATERIAL RETURN PROCEDURE
- 18. ORDERING SERVICE AND SPARE PARTS ORDER
- 19. MAINTENANCE
- 20. TROUBLE SHOOTING
- ANNEXE AER32 01-N.pdf
- COUVERTURE DERNIERE IOM AER32 01-EN.pdf
English
9SYSAER R32
2. INSPECTION AND STORAGE
At the time of receiving the equipment carefully cross check all the elements against the shipping documents
in order to ensure that all the crates and boxes have been received. Inspect all the units for any visible or
hidden damage.
Conrmation of the type of unit ordered can be obtained by reading the maker’s plate (capacity, type and
air blowing conguration).
In the event of shipping damage, write precise details of the damage on the shipper’s delivery note and
send immediately a registered letter to the shipper within 48 hours, clearly stating the damage caused.
Forward a copy of this letter to the manufacturer or his representative.
Never store or transport the unit upside down. Protect unit at the job side from damages made by others.
When unit is stored on the ground, avoid mud store unit leveled.
The appliances are delivered fully assembled, factory tested and ready to operate.
Any modication to the units without the manufacturer’s prior approval, shall automatically render the
warranty null and void.
The following conditions must be respected in order to maintain the validity of the warranty:
² Commissioning shall be performed by specialised technicians from technical services approved by
the manufacturer.
² Maintenance shall be performed by technicians trained for this purpose.
² Only Original Equipment spare parts shall be used.
² All the operations listed in the present manual shall be performed within the required time limits.
THE WARRANTY SHALL BE NULL AND VOID IN THE EVENT
OF NON-COMPLIANCE WITH ANY OF THE ABOVE CONDITIONS.
3. WARRANTY
INSTRUCTIONS FOR FILLING IN THE "1st START-UP FORM"
(SEE APPENDIX)
It is the responsibility of the OWNER to make sure that the "1st Start-up Form" is fully lled in by the
authorized Service Centre and sent by registered mail - notied in advance by fax - to the After-Sales
Service of the constructor within 8 days of the initial start-up.
Failure to receive the form on the part of the constructor will render the guarantee null and void.
4. PRESENTATION
All the models in the SYSAER R32 are produced to state-of-the-art design and manufacturing standards. In
this way, they offer guarantees of high performance and reliability as well as the capability of adapting to
all types of air conditioning installations. The unit has been designed for an outdoor mounted application,
ensuring perfectly weatherproof circulation of the air within the compartments. It is not adapted for any use
other than those specied in the present manual.
Improper usage of the unit or a use for purposes other than those originally intended, without the prior
approval by the manufacturer or its agents, could result in the unit functioning outside its safe operating
limits and could present risks to both personnel and property.
The SYSAER R32 is design very compact and it has an optimal foot print/weight ratio. Numerous accessories
and options can be added to the basic version to adapt it perfectly to the client’s specic requirements.
The SYSAER R32 units are designed to safeguard to environment and reduce building energy consumption
by the use of R32 as a refrigerant and double skin 25 mm panels for greater thermal insulation.
After the units are assembled, the refrigerating and electrical circuits are tested at the factory in order to
guarantee correct operation.
The are lled with an operational refrigerant uid charge and are subjected to pressure tightness tests.