FC101 Design Guide

8 General Specications
8.1 Mechanical Dimensions
8.1.1 Side-by-side Installation
The frequency converter can be mounted side by side but requires the clearance above and below for cooling.
Power [kW (hp)] Clearance above/below [mm (in)]
Size IP class 3x200–240 V 3x380–480 V 3x525–600 V
H1 IP20 0.25–1.5 (0.33–2) 0.37–1.5 (0.5–2) 100 (4)
H2 IP20 2.2 (3) 2.2–4 (3–5) 100 (4)
H3 IP20 3.7 (5) 5.5–7.5 (7.5–10) 100 (4)
H4 IP20 5.5–7.5 (7.5–10) 11–15 (15–20) 100 (4)
H5 IP20 11 (15) 18.5–22 (25–30) 100 (4)
H6 IP20 15–18.5 (20–25) 30–45 (40–60) 18.5–30 (25–40) 200 (7.9)
H7 IP20 22–30 (30–40) 55–75 (70–100) 37–55 (50–70) 200 (7.9)
H8 IP20 37–45 (50–60) 90 (125) 75–90 (100–125) 225 (8.9)
H9 IP20 2.2–7.5 (3–10) 100 (4)
H10 IP20 11–15 (15–20) 200 (7.9)
I2 IP54 0.75–4.0 (1–5) 100 (4)
I3 IP54 5.5–7.5 (7.5–10) 100 (4)
I4 IP54 11–18.5 (15–25) 100 (4)
I6 IP54 22–37 (30–50) 200 (7.9)
I7 IP54 45–55 (60–70) 200 (7.9)
I8 IP54 75–90 (100–125) 225 (8.9)
Table 8.1 Clearance Required for Cooling
NOTICE!
With IP21/NEMA Type1 option kit mounted, a distance of 50 mm (2 in) between the units is required.
General Specications Design Guide
MG18C822 Danfoss A/S © 04/2018 All rights reserved. 105
8 8