Installation , Operation and Maintenance Instructions Genius
7 Commissioning
7.1 First Commissioning
NOTE
Prevent dirt from entering the ducts and the unit.
" Do not commission the unit until all work has been completed.
7.1.1 Commissioning of the Heating during the cold Season
Due to the limited heating capacity of the system, which is designed for the operation of a low-energy house, the building / residential
unit must be heated during the cold season by the customer before the combi unit is taken into operation.
1. Heat the building/residential unit.
2. Start the combi unit.
» The heating time will be signicantly reduced.
7.2 Fill and Vent
7.2.1 Remove Panels
WARNING
Risk of impact or crushing due to falling parts!
The panels are not xed. They can fall down after loosening the screws.
Hold the panels during loosening and put it down to the oor.
" Loosen the front and the side panel.
" Hold the panels tight and remove them.
7.2.2 Filling Drinking Water Tank
" Open the cold water inlet pipe of the tank.
" Fill the drinking water tank.
" Open a tap at the highest tapping point until the water is free from bubbles.
" Close the tap at the highest tapping point after lling.
" Close the tap after lling.
7.2.3 ConnectingPipes(ll/ushstoragechargingcircuit)
NOTE
First commissioning:
Ensure sufcient ushing and venting during rst commissioning.
25
Genius - V 1.0
Commissioning