SAVE VTC 700 INSTALLATIONV01
Table Of Contents
Prerequisites for Installation |
5
Checking delivery
• Check the packaging and the air handling unit for transport damage. Any findings should be noted on the cargo
manifest.
• Check completeness of the delivery.
Verify that all ordered equipment is delivered before starting the installation. Any discrepancies from the ordered
equipment must be reported to the supplier of Systemair products.
Warning
When opening the transport packaging, there is a risk of damage from sharp edges, nails, staples, splinters
etc.
Unpacking
• Check the air handling unit for visible transport damage.
• Only remove the packaging shortly before assembly.
• Beware of sharp edges during mounting and maintenance. Use protective gloves.
5 Prerequisites for Installation
To ensure a proper and fail-free operation, it is important that the unit is installed according to these instructions.
5.1 Location and Space Requirements
The SAVE VTC 700 should preferably be installed in a separate room (e.g. storeroom, laundry room or similar.).
When choosing the location it should be kept in mind that the unit requires maintenance regularly and that the inspec-
tion door should be easily accessible. Leave free space for opening the door and for taking out the main components
(figure 4).
Fig. 4 Space required
Position Description
1
Filter outdoor air
2
Filter extract air
3
Heat exchanger
1
B 1380 mm
1
Two parts
254492 | v01