SAVE VTR 100B INSTALLATIONV1
Table Of Contents
- 1 Overview
- 2 Important Safety Information
- 3 Technical Data
- 4 Delivery, Transport, Storage
- 5 Prerequisites for Installation
- 6 Connection box installation and switching orientation from Right-hand to Left–hand
- 7 Installation
- 8 Electrical connections
- 9 Before Starting the System
- 10 Commissioning
- 11 Concluding Routines
- 12 Disposal and recycling
- 13 EU Declaration of Conformity
254537 | v2
© Copyright Systemair UAB
All rights reserved
E&OE
Systemair UAB reserves the rights to change their products without notice.
This also applies to products already ordered, as long as it does not affect the previously agreed specifications.
Systemair is not liable or bound by the warranty if these instructions are not adhered to during installation or service.