SAVE VTR 100B INSTALLATIONV1
Table Of Contents
- 1 Overview
- 2 Important Safety Information
- 3 Technical Data
- 4 Delivery, Transport, Storage
- 5 Prerequisites for Installation
- 6 Connection box installation and switching orientation from Right-hand to Left–hand
- 7 Installation
- 8 Electrical connections
- 9 Before Starting the System
- 10 Commissioning
- 11 Concluding Routines
- 12 Disposal and recycling
- 13 EU Declaration of Conformity
12
| Installation
7.2 Installation with MONOLIT-B cooker hood
Fig. 8 Installation of the cooker hood
Product name and number
• MONOLIT - B White – 326800
• MONOLIT - B S.Steel – 326801
Important
Follow instructions delivered with the cooker
hood how to prepare it before installation.
1. Pull the cooker hood power supply and control cables
to the top since the mounted SAVE VTR 100/B unit will
block access to the back.
Fig. 9 Placing the unit on the mounting bracket (the cooker hood is not shown)
2. Once all cooker hood cables at the back are led to the top, lift the unit and hang it on the mounting bracket.
Warning
Beware of sharp edges during mounting and maintenance. Use protective gloves.
Consider the unit weight when mounting!
3. Connect the cooker hood to the unit via a flexible duct.
Note:
Make sure that the unit is completely vertical and horizontal once mounted on the wall. Check with a spirit
level.
Make sure there is at least 2 mm gap between the unit and the cupboard to prevent vibration noises.
254537 | v2