SYSTEMP – Installation Operation Manual (IOM SYSTEMP rev.N)
Table Of Contents
- WARRANTY CONDITIONS
- 1 DESCRIPTION OF UNITS AND OPERATING LIMITS
- 2 TRANSPORTATION, POSITIONING AND INSTALLATION PROCEDURES
- 3 PLENUMS, VENTILATED PLENUMS AND DUCT SECTIONS (ACCESSORY)
- 4 FREE COOLING PLENUM (ACCESSORY)
- 5 ADJUSTABLE AND VENTILATED PLINTHS (ACCESSORY)
- 6 TMC AIR-COOLED CONDENSER PLACEMENT AND INSTALLATION
- 7 CONNECTION OF CONDENSATE DISCHARGE AND HUMIDIFIER
- 8 WATER CIRCUIT CONNECTIONS
- 9 COOLING CONNECTIONS
- 9.1 ROUTING OF THE COOLING CIRCUIT PIPES
- 9.2 COOLING CIRCUIT SIZING
- 9.3 COOLING CIRCUIT INSTALLATION
- 9.4 UNIT COOLING PIPE CONNECTION
- 9.5 AIR-COOLED CONDENSER CONNECTION
- 9.6 COOLING CIRCUIT VACUUM DRYING OPERATIONS
- 9.7 CHARGING THE COOLING CIRCUIT
- 9.8 PRECAUTIONS
- 9.9 LUBRICATING OIL FILLING IN THE CIRCUIT
- 9.10 TMC CONDENSER PRESSURE REGULATOR (ACCESSORY)
- 9.11 CHECKING THE REFRIGERANT LOAD AND COOLING CIRCUIT OPERATION
- 9.12 PRECAUTIONS AGAINST REFRIGERANT LEAKS
- 9.13 CHECKING THE MAXIMUM CONCENTRATION OF REFRIGERANT
- 10 EXAMPLES OF WATER AND COOLING CIRCUITS
- 10.1 EXAMPLE OF CHILLED WATER CIRCUIT
- 10.2 TMC AIR-COOLED CONDENSER COOLING CIRCUIT
- 10.3 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.4 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.5 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.6 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.7 TWO SOURCES WATER CIRCUIT WITH CHILLED WATER CIRCUITS
- 10.8 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.9 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.10 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.11 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.12 COOLING CIRCUIT WITH FREE COOLING AND SINGLE COMPRESSOR
- 10.13 COOLING CIRCUIT WITH FREE COOLING AND DOUBLE COMPRESSOR
- 11 ELECTRICAL CONNECTIONS
- 11.1 RS485 SERIAL COMMUNICATION BOARD CONNECTION (Modbus RTU - BACnet MS/TP)
- 11.2 ETHERNET RJ45 PORT CONNECTION (Modbus TCP - BACnet IP - Web Server)
- 11.3 CANbus LAN CONNECTION (ACCESSORY)
- 11.4 REMOTE CONTROL TERMINAL CONNECTION (ACCESSORY)
- 11.5 WALL-MOUNTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.6 DUCTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.7 CONNECTION OF THE SMOKE AND FLAME DETECTORS SUPPLIED (ACCESSORY)
- 11.8 WATER DETECTION PROBE CONNECTION (ACCESSORY)
- 11.9 CONNECTION OF FREE COOLING PLENUM MOTORISED DAMPER ACTUATORS (ACCESSORY)
- 11.10 AIR-COOLED CONDENSER POWER SUPPLY AND REGULATION CONNECTION (ACCESSORY)
- 12 ROUTINE AND SPECIAL MAINTENANCE
- 13 DEACTIVATION, DISMANTLING AND DISPOSAL
- 14 APPENDIX 1: RECOMMENDED EQUIPMENT
- 15 APPENDIX 2: PRELIMINARY CHECKS AND FIRST START-UP
- 16 APPENDIX 3: FAULT DIAGNOSIS
- 17 NOTES
84
11.7 CONNECTION OF THE SMOKE AND FLAME DETECTORS SUPPLIED (ACCESSORY)
The smoke and ame detectors supplied detect the presence of smoke or ames in the environment.
The supplied probe is of wall installation type. The connections must be made as indicated in the electrical wiring diagram
supplied with the unit. The terminal board for connecting the sensor is shown in the gure below.
A Anchor holes
B “R” terminal
C “+” terminal
D “-” terminal
E “NO” relay terminal
F “C” relay terminal
G “NC” relay terminal
H Blade for short circuit
Smoke and ame sensors Anchor base and connection
Connection of the smoke and ame sensors
The type of cable to be used for the connection must have the following features:
Main features of the connection cable
Type FS18OR18 300/500 Vac cable
Shielding Not required
Cross-section and number of conductors 4 x 1 mm
2
Maximum length m 100
Example
A
F
E
A
B
D
H
C
G