8.3 CHILLED WATER CIRCUITS CONNECTION - FREE COOLING DESIGN
Machines in Free Cooling execution are supplied with water circuits connected to the pre-set valve and water condenser.
Accordingly it will be necessary to set up the circuit water supply and discharge lines. The diameters of the pipes and the inlet and
outlet ttings are identied in the order conrmation or in the following tables for standard models (identied by the code number
sequence).
Water connections
Standard models
Fitting diameter Ø Threading Water circuit volume
Inches DN ISO 7/1 dm
3
P Series
321 1-1/4” 32
Female
18
461 - 512
1-1/2” 40
26.5
662 – 852 33.5
R Series
231 1” 25 Female 17.5
The maximum pressure of the water supply to the coils is 16 bar (1.6 MPa). The maximum pressure dierence between
the water inlet pipe to the valve and the outlet pipe is 1.8 bar (180 kPa), as at pressure dierences greater than this value the return
spring would not be able to shut o the water ow. In the event of greater pressure dierences, it will be necessary to install pressure
reducing valves upstream of the valve.
8.3.1 SETTING UP THE CHILLED WATER CIRCUITS - FREE COOLING DESIGN
The positions of the water inlet and outlet connections are indicated in the gure below. The connections can also be iden-
tied by the adhesive labels applied on the pipes of the unit near the connections.
A Armaex insulation
B Mechanical lter
C Thermometer
D Shut-o valve
E Pressure gauge
F Balancing valve
G Discharge
H Supports
Water connections Water circuit supply line
To ensure that circuit pipes are installed correctly, we recommend you follow the instructions below:
Use piping suited to the circuit pressure (copper, steel or plastic).
Secure pipes with suitable brackets.
Insulate both pipes with Armaex type insulation.
Install shut-o valves to facilitate maintenance.
Install a Thermometer and Pressure gauge on the inlet and outlet.
Install a discharge outlet at the lowest part of the circuit.
Install a 50 μ mechanical lter on the supply line.
Install a balance valve on the return line.
Use water and glycol where necessary.
A
F
H
C
B
G
D
E