SYSTEMP – Installation Operation Manual (IOM SYSTEMP rev.N)
Table Of Contents
- WARRANTY CONDITIONS
- 1 DESCRIPTION OF UNITS AND OPERATING LIMITS
- 2 TRANSPORTATION, POSITIONING AND INSTALLATION PROCEDURES
- 3 PLENUMS, VENTILATED PLENUMS AND DUCT SECTIONS (ACCESSORY)
- 4 FREE COOLING PLENUM (ACCESSORY)
- 5 ADJUSTABLE AND VENTILATED PLINTHS (ACCESSORY)
- 6 TMC AIR-COOLED CONDENSER PLACEMENT AND INSTALLATION
- 7 CONNECTION OF CONDENSATE DISCHARGE AND HUMIDIFIER
- 8 WATER CIRCUIT CONNECTIONS
- 9 COOLING CONNECTIONS
- 9.1 ROUTING OF THE COOLING CIRCUIT PIPES
- 9.2 COOLING CIRCUIT SIZING
- 9.3 COOLING CIRCUIT INSTALLATION
- 9.4 UNIT COOLING PIPE CONNECTION
- 9.5 AIR-COOLED CONDENSER CONNECTION
- 9.6 COOLING CIRCUIT VACUUM DRYING OPERATIONS
- 9.7 CHARGING THE COOLING CIRCUIT
- 9.8 PRECAUTIONS
- 9.9 LUBRICATING OIL FILLING IN THE CIRCUIT
- 9.10 TMC CONDENSER PRESSURE REGULATOR (ACCESSORY)
- 9.11 CHECKING THE REFRIGERANT LOAD AND COOLING CIRCUIT OPERATION
- 9.12 PRECAUTIONS AGAINST REFRIGERANT LEAKS
- 9.13 CHECKING THE MAXIMUM CONCENTRATION OF REFRIGERANT
- 10 EXAMPLES OF WATER AND COOLING CIRCUITS
- 10.1 EXAMPLE OF CHILLED WATER CIRCUIT
- 10.2 TMC AIR-COOLED CONDENSER COOLING CIRCUIT
- 10.3 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.4 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.5 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.6 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.7 TWO SOURCES WATER CIRCUIT WITH CHILLED WATER CIRCUITS
- 10.8 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.9 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.10 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.11 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.12 COOLING CIRCUIT WITH FREE COOLING AND SINGLE COMPRESSOR
- 10.13 COOLING CIRCUIT WITH FREE COOLING AND DOUBLE COMPRESSOR
- 11 ELECTRICAL CONNECTIONS
- 11.1 RS485 SERIAL COMMUNICATION BOARD CONNECTION (Modbus RTU - BACnet MS/TP)
- 11.2 ETHERNET RJ45 PORT CONNECTION (Modbus TCP - BACnet IP - Web Server)
- 11.3 CANbus LAN CONNECTION (ACCESSORY)
- 11.4 REMOTE CONTROL TERMINAL CONNECTION (ACCESSORY)
- 11.5 WALL-MOUNTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.6 DUCTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.7 CONNECTION OF THE SMOKE AND FLAME DETECTORS SUPPLIED (ACCESSORY)
- 11.8 WATER DETECTION PROBE CONNECTION (ACCESSORY)
- 11.9 CONNECTION OF FREE COOLING PLENUM MOTORISED DAMPER ACTUATORS (ACCESSORY)
- 11.10 AIR-COOLED CONDENSER POWER SUPPLY AND REGULATION CONNECTION (ACCESSORY)
- 12 ROUTINE AND SPECIAL MAINTENANCE
- 13 DEACTIVATION, DISMANTLING AND DISPOSAL
- 14 APPENDIX 1: RECOMMENDED EQUIPMENT
- 15 APPENDIX 2: PRELIMINARY CHECKS AND FIRST START-UP
- 16 APPENDIX 3: FAULT DIAGNOSIS
- 17 NOTES
26
3.3 INSTALLATION OF PLENUMS AND VENTILATED PLENUMS (G SERIES UNIT) UNDER THE UNIT
When installing plenums under the unit, it is advisable to place a layer of vibration damping material (rubber or equivalent
material with a minimum thickness of 10 mm) between them and the oor to avoid transmitting vibrations to the structure of the
building.
The interposition of vibration damping material also enables the recovery of a slight lack of atness of the oor and to con-
tain the noise level of installation.
Do the following to install a plenum under the unit:
1) Set the plenum on the oor and place a seal (rubber or other equivalent material with minimum 5 mm thickness) on the
plenum proles.
2) Position the unit on the plenum, making sure that the sections are properly aligned with each other.
3) Attach the unit to the plenum with duly-sized self-drilling screws or bolts (optional).
A Plenum
Example of installation with lower plenum
A