SYSTEMP – Installation Operation Manual (IOM SYSTEMP rev.N)
Table Of Contents
- WARRANTY CONDITIONS
- 1 DESCRIPTION OF UNITS AND OPERATING LIMITS
- 2 TRANSPORTATION, POSITIONING AND INSTALLATION PROCEDURES
- 3 PLENUMS, VENTILATED PLENUMS AND DUCT SECTIONS (ACCESSORY)
- 4 FREE COOLING PLENUM (ACCESSORY)
- 5 ADJUSTABLE AND VENTILATED PLINTHS (ACCESSORY)
- 6 TMC AIR-COOLED CONDENSER PLACEMENT AND INSTALLATION
- 7 CONNECTION OF CONDENSATE DISCHARGE AND HUMIDIFIER
- 8 WATER CIRCUIT CONNECTIONS
- 9 COOLING CONNECTIONS
- 9.1 ROUTING OF THE COOLING CIRCUIT PIPES
- 9.2 COOLING CIRCUIT SIZING
- 9.3 COOLING CIRCUIT INSTALLATION
- 9.4 UNIT COOLING PIPE CONNECTION
- 9.5 AIR-COOLED CONDENSER CONNECTION
- 9.6 COOLING CIRCUIT VACUUM DRYING OPERATIONS
- 9.7 CHARGING THE COOLING CIRCUIT
- 9.8 PRECAUTIONS
- 9.9 LUBRICATING OIL FILLING IN THE CIRCUIT
- 9.10 TMC CONDENSER PRESSURE REGULATOR (ACCESSORY)
- 9.11 CHECKING THE REFRIGERANT LOAD AND COOLING CIRCUIT OPERATION
- 9.12 PRECAUTIONS AGAINST REFRIGERANT LEAKS
- 9.13 CHECKING THE MAXIMUM CONCENTRATION OF REFRIGERANT
- 10 EXAMPLES OF WATER AND COOLING CIRCUITS
- 10.1 EXAMPLE OF CHILLED WATER CIRCUIT
- 10.2 TMC AIR-COOLED CONDENSER COOLING CIRCUIT
- 10.3 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.4 COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.5 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.6 COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.7 TWO SOURCES WATER CIRCUIT WITH CHILLED WATER CIRCUITS
- 10.8 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND REMOTE CONDENSER
- 10.9 TWO SOURCES COOLING CIRCUIT WITH SINGLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.10 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND REMOTE CONDENSER
- 10.11 TWO SOURCES COOLING CIRCUIT WITH DOUBLE COMPRESSOR AND WATER-COOLED CONDENSER
- 10.12 COOLING CIRCUIT WITH FREE COOLING AND SINGLE COMPRESSOR
- 10.13 COOLING CIRCUIT WITH FREE COOLING AND DOUBLE COMPRESSOR
- 11 ELECTRICAL CONNECTIONS
- 11.1 RS485 SERIAL COMMUNICATION BOARD CONNECTION (Modbus RTU - BACnet MS/TP)
- 11.2 ETHERNET RJ45 PORT CONNECTION (Modbus TCP - BACnet IP - Web Server)
- 11.3 CANbus LAN CONNECTION (ACCESSORY)
- 11.4 REMOTE CONTROL TERMINAL CONNECTION (ACCESSORY)
- 11.5 WALL-MOUNTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.6 DUCTED TEMPERATURE AND HUMIDITY PROBE CONNECTION (ACCESSORY)
- 11.7 CONNECTION OF THE SMOKE AND FLAME DETECTORS SUPPLIED (ACCESSORY)
- 11.8 WATER DETECTION PROBE CONNECTION (ACCESSORY)
- 11.9 CONNECTION OF FREE COOLING PLENUM MOTORISED DAMPER ACTUATORS (ACCESSORY)
- 11.10 AIR-COOLED CONDENSER POWER SUPPLY AND REGULATION CONNECTION (ACCESSORY)
- 12 ROUTINE AND SPECIAL MAINTENANCE
- 13 DEACTIVATION, DISMANTLING AND DISPOSAL
- 14 APPENDIX 1: RECOMMENDED EQUIPMENT
- 15 APPENDIX 2: PRELIMINARY CHECKS AND FIRST START-UP
- 16 APPENDIX 3: FAULT DIAGNOSIS
- 17 NOTES
21
2.2.2 HANDLING THE UNITS
During site handling the machine must be left in its original packaging until it has reached the installation position.
The unit must be lifted and transported by means of a forklift truck, pallet truck, winch hoist or through a rope lifting system.
In case of rope lifting, the ropes must be slid underneath the pallet the unit is tted with, and sti spacers must be arranged to ensure
the ropes do not crush the unit's structure during lifting.
To avoid any form of damage it is necessary not to set the machines horizontally during storage, handling and installation
operations.
Handling equipment Position of ropes for lifting
2.2.3 REMOVING THE PACKAGING
If the unit is not to be installed immediately after its arrival on site, it should be stored in its original packaging, in a dry,
enclosed area that is preferably heated during the winter months.
For nal placement of the units the shipping packaging must be removed. Remove the packaging as follows:
1) Cut the protective polyethylene sheet that the unit is wrapped in, paying attention not to damage the paint while cutting.
2) Remove the shock-resistant polystyrene cladding.
Removing the packaging