SYSTEMP – Installation Operation Manual (IOM SYSTEMP rev.N)

Table Of Contents
106
15.1.9 VERIFY CONNECTIONS TO ROOM PROBE, REMOTE TERMINALS, LAN AND RS485 SERIAL BOARD (IF PRESENT)
Description Positive Negative
1
Make sure the RS485 board is wired as indicated on the wiring diagram and in the instal-
lation manual.
2 Check the activation of the terminating resistance of the RS485 network.
3
Check connection of LAN cable as indicated in the electrical wiring diagram and the instal-
lation manual.
4 Check the activation of the opening and terminating resistance of the LAN.
5 Check the positioning of the remote terminal as described in the installation manual.
6
Check that the electrical connection between the remote terminal and the electrical panel
is as indicated in the wiring diagram and the installation manual.
7 Check the positioning of the room probes as described in the installation manual.
8
Check that electrical connection between the sensors and the electrical panel is as indicat-
ed in the electrical wiring diagram and the installation manual.
9
Check the positioning of the smoke and ame detectors as described in the installation
manual.
10
Check the electrical connection between the smoke and ame sensors, as indicated in the
electrical wiring diagram and the installation manual.
11
Check the positioning of the water detection probes as described in the installation man-
ual.
12
Check that the electrical connection between the water detection sensors and the electri-
cal panel is as indicated in the electrical wiring diagram and the installation manual.
13 Check the wiring of the closing resistance of the water detection sensors.