IOM BACNET GATEWAY

46
Histogram
For histograms and graphs, you can only select three objects, and select either IDU or refrigerant
system. The selected time for graphs and lists is based on the month (effective graph is based on day).
In the graphs, histograms and tables, the optional parameters are "Total Energy" and "Operating Energy".
There are only two options in total energy: total energy, and operating energy.
Operating Energy
Operating Electricity
Operating Electricity
Total Energy
Operating electricity + standby power
Operating electricity + standby power + exceptional energy
IDU
ODU
6.3.2 Histogram and Graph
Line Chart