EDM SYSHP MINI SPLIT 06 16
Table Of Contents
- CONTENTS
- CONTENTS
- 1.1 System Schematic
- 1.2 System Configurations
- 2 Unit Capacities
- 2.1 Outdoor unit
- 3 Nomenclature
- 3.1 Outdoor unit
- 3.2 Hydronic box
- 4 System Design and Unit Selection
- 4.1 Selection procedure
- 4.2 M thermal Leaving Water Temperature (LWT) Selection
- 5 Typical Applications
- 5.1 Space Heating Only
- 5.2 Space Heating and Domestic Hot Water
- 5.3 Space Heating, Space Cooling and Domestic Hot Water
- 5.4 Space Heating and Domestic Hot Water (Bivalent)
- 5.4.2 Auxiliary heat source provides space heating and domestic hot water
- 5.5 Space Heating Through Floor Heating Loops and Radiators
- 5.6 Space Heating, Space Cooling and Domestic Hot Water Compatible with Solar Water Heater
- Part 2 Engineering Data
- 1.1 Outdoor Unit
- 1.2 Hydronic Box
- 2 Dimensions and Center of Gravity
- 2.1 Outdoor Unit
- 2.2 Hydronic Box
- 3.1 Outdoor Unit
- 4 Wiring Diagrams
- 4.1 Outdoor Unit
- 4.2 Hydronic Box
- 5 Capactiy Tables
- 5.2 Cooling Capacity Tables (Test standard:EN14511)
- 7 Hydronic Performance
- 8.1 Overall
- 8.2 Octave Band Levels
- 9.1 Outdoor Unit
- 1.1 Notes for Installers Boxes
- 2 Installation
- 2.1 Acceptance and Unpacking
- 2.3 Outdoor unit
- 1
- 1.1
- 1.2
- 1.3
- 1.4
- 1.5
- 2.4 Hydronic box
- 3 Refrigerant Pipework
- 3.1 Permitted Piping Length and Level Difference
- 3.3 Procedure and Principles
- 3.4 Storing Copper Piping
- 3.8 Pipe Flushing
- 3.9 Gastightness Test
- 4 Water Pipework
- 4.1 Water Circuit Checks
- 4.2 Water volume and sizing expansion vessels
- 4.3 Water Circuit Connection
- 4.4 Water Circuit Anti-freeze Protection
- 5.1 General
- 5.4 Wiring Overview
- 8.1 Introduction
- 8.2 Menu Structure
- 8.11 HOLIDAY AWAY SETTING Menu
- 8.14 TEST RUN
- 8.15 SPECIAL FUNCTION
- 8.16 AUTO RESTART
- 8.20 HMI ADDRESS SET
- 9 Operation parameter
- 10 Network Configuration Guidelines
- 10.1 Install APP
- 10.2 Sign in
- 10.3 Add device and login to home Wi-Fi
- 10.4 Wired Controller Setting
- 10.4.2 Finishing up
- 11 USB Function Guidelines
- 11.1 Parameters setting transfer between wired controllers
- 11.2 Convenient program upgrade for unit
- 12 Climate Related Curves
- 13 Error Code Table
- Part 1 General Information
- Part 2 Engineering Data
- Part 3
- Installation and Field Settings
- 1 Air-to-Water HP Split System
- 2 Unit Capacities
- 3 Nomenclature
- 4 System Design and Unit Selection
- 5 Typical Applications
- 1 Specifications
- 3 Piping Diagrams
- 4 Wiring Diagrams
- 5 Capactiy Tables
- 6 Operating Limits
- 7 Hydronic Performance
- 8 Sound Levels
- 9 Accessories
- 1 Preface to Part 3
- 3 Refrigerant Pipework
- 4 Water Pipework
- 6 DIP Switch Settings
- 7 Internal Circulation Pump
- 8 User Interface Field Settings
- 9 Operation parameter
- 10 Network Configuration Guidelines
- 11 USB Function Guidelines
- 12 Climate Related Curves
- 13 Error Code Table
101
Figure 3-8.43: Preheang for oor screens
During the oor drying up operaon all buons except OK are inacvated. To exit the oor
drying up operaon, press OK and then select YES when prompted.
Note: In the event of a heat pump malfuncon, oor drying up mode will connue if a
backup electric heater and/or addional heang source is available and congured to
support space heang mode.
Figure 3-8.44: FLOOR DRYING UP menu
Figure 3-8.46:
FLOOR DRYING UP screen
8.15.3 FLOOR DRYING UP
MENU > FOR SERVICEMAN > SPECIAL FUNCTION > FLOOR
DRYING UP
For newly-installed under-oor heang systems, oor drying
up mode can be used to remove moisture from the oor slab
and suboor to prevent warping or rupture of the oor during
oor heang operaon. There are three phases to the oor
drying up operaon:
▪ Phase 1: gradual temperature increase from a starng point of 25°C to the peak temperature
▪ Phase 2: maintain peak temperature
▪ Phase 3: gradual temperature decrease from the peak temperature to 45°C
t_DRYUP sets the duraon of Phase 1.
t_HIGHPEAK sets the duraon of Phase 2.
t_DRYDOWN is the duraon of Phase 3.
T_DRYPEAK sets the heat pump’s leaving water set temperature for Phase 2.
START TIME sets the oor drying up operaon start me.
START DATE sets the oor drying up operaon start date.
The heat pump’s leaving water set temperature during the oor drying up operaon is illustrated in Figure 3-8.45.
Figure 3-8.45: FLOOR DRYING UP sengs
Time