TM MINI C VRF 8 12KW
110
4  
4.1  
4.1.1  
4.1.2  
1.  
2.  
3.
4.
5.  
6.  
Pipe flushing should be performed once the brazed connections have been completed with the exception of 
the final connections to the indoor units.  That  is,  flushing  should  be  performed once  the outdoor unit have  been 
connected but before the indoor units are connected. 
Vacuum drying
4
Pipe  manipulation
5
razing
2
techniques
Gas tightness test
6










