SYSPLIT WALL EDGE R32 INSTALLATION MANUAL
 Page 32 
Test Run
9
Before Test Run
Only perform test run after you have completed 
the following steps:
• 
Electrical Safety Checks – Confirm that 
the unit’s electrical system is safe and 
operating properly
• 
Gas Leak Checks – Check all flare nut 
connections and confirm that the system is 
not leaking
• 
Confirm that gas and liquid (high and low 
pressure) valves are fully open
Test Run Instructions
You should perform the Test Run for at least 30 
minutes.
1. 
Connect power to the unit.
2. 
Press the ON/OFF  button on the remote 
controller to turn it on.
3. 
Press the MODE  button to scroll through the 
following functions, one at a time:
• 
COOL – Select lowest possible temperature
• 
HEAT – Select highest possible temperature
4. 
Let each function run for 5 minutes, and 
perform the following checks:
List of Checks to Perform PASS/FAIL
No electrical leakage
Unit is properly grounded
All electrical terminals 
properly covered
Indoor and outdoor units 
are solidly installed
All pipe connection 
points do not leak
Outdoor 
(2):
Indoor 
(2):
Water drains properly 
from drain hose
All piping is properly 
insulated
Unit performs COOL 
function properly
Unit performs HEAT 
function properly
Indoor unit louvers 
rotate properly
Indoor unit responds to 
remote controller
Test Run










