CORRIGO VENTILATION 3.6 MANU

Table Of Contents
Manual Corrigo Ventilation, revision V Chapter 17 Configuration 97
Step controller Heating activation levels for sequential control.
For binary control the activation levels are calculated by the controller depending on the
number of steps involved
Start step1: 10 %
Stop step1: 5 %
Start step2: 45 %
Stop step2: 40 %
Start step3: 70 %
Stop step3: 65 %
Start step4: 95 %
Stop step4: 90 %
Control parameters. Heater groups is used to calculate activation levels for binary control.
"Hyst." is the switching differential used for each step when running binary control.
Nbr of steps: 4
Minimum on/off
time: 60 s
Hyst: 0.5 %
17.25.2 Step controller cooling
"Step controller Cooling" can be set to sequential or binary.
Step contr. cooling
Sequential
"Step controller Cooling" activation levels for sequential control.
For binary control the activation levels are calculated by the controller depending on the
number of steps involved
Start step 1: 10 %
Stop step 1: 5 %
Start step 2: 50 %
Stop step 2: 45 %
Start step 3: 95 %
Stop step 3: 90 %
Control parameters. Chiller groups is used to calculate activation levels for binary control.
Hyst.” is the switching differential used for each step when running binary control.
Nbr of steps: 3
Minimum on/off-
time: 60 sec
Hyst: 0.5 %
When DX cooling is used in conjunction with pressure controlled or flow controlled fans it is
possible to block DX cooling if the supply air fan control signal falls below a preset values.
The blocking level is individually settable for each DX cooling step.
At lower SAF output
block step1: 0 %
block step2: 0 %
block step3: 0 %
For a more detailed description, see section 5.1.4 Step controllers.