INSTALLATION OPERATION AND MAINTENANCE INSTRUCTION ZRS CE002

4 Installation
4.1 To do before the installation
of the product
Use installation material with fire resistance rating for the
installation location.
Examine the packaging for transportation damage and re-
move the packaging from the product carefully.
Examine the product and all components for damage.
Make sure that the motor effect and the fan performance
agrees with the expectations at the installation location.
Make sure that the information on the name plate and the
motor name plate agrees with the operation conditions.
Install the product in a location where there is space for
commissioning, troubleshooting and maintenance.
Make sure that the installation location is clean and dry,
for full safety during electrical work.
Make sure that the installation surface has sufficient ca-
pacity to hold the weight of the product.
Refer to the airflow direction arrows on the name plate or
on the product to install the product in the correct position.
Make sure that all cable glands are tight against the ca-
bles to prevent leaks.
4.2 To Install the product
Note:
Make sure that the installation location has space for
maintenance.
Note:
Install the product so that unwanted vibrations are not
transmitted to duct systems or roof beams.
Note:
The product must be installed horizontally.
Note:
Obey local laws and regulations for installation of the
smoke gas fan.
1 Put the supplied insulation carpet on top of the chimney
or duct system.
2 Cut a hole in the insulation carpet. Make sure that the
hole has the same dimension as the inlet cone of the fan.
3 Install the 4 adjustable steering rods in the holes in the
bottom plate of the fan. Use the supplied screws and
nuts.
4x
4