INSTALLATION OPERATION AND MAINTENANCE INSTRUCTION ZRS CE002
Table Of Contents
4 Installation
4.1 To do before the installation
of the product
• Use installation material with fire resistance rating for the
installation location.
• Examine the packaging for transportation damage and re-
move the packaging from the product carefully.
• Examine the product and all components for damage.
• Make sure that the motor effect and the fan performance
agrees with the expectations at the installation location.
• Make sure that the information on the name plate and the
motor name plate agrees with the operation conditions.
• Install the product in a location where there is space for
commissioning, troubleshooting and maintenance.
• Make sure that the installation location is clean and dry,
for full safety during electrical work.
• Make sure that the installation surface has sufficient ca-
pacity to hold the weight of the product.
• Refer to the airflow direction arrows on the name plate or
on the product to install the product in the correct position.
• Make sure that all cable glands are tight against the ca-
bles to prevent leaks.
4.2 To Install the product
Note:
Make sure that the installation location has space for
maintenance.
Note:
Install the product so that unwanted vibrations are not
transmitted to duct systems or roof beams.
Note:
The product must be installed horizontally.
Note:
Obey local laws and regulations for installation of the
smoke gas fan.
1 Put the supplied insulation carpet on top of the chimney
or duct system.
2 Cut a hole in the insulation carpet. Make sure that the
hole has the same dimension as the inlet cone of the fan.
3 Install the 4 adjustable steering rods in the holes in the
bottom plate of the fan. Use the supplied screws and
nuts.
4x
4