Installation Instruction
Table Of Contents
- 1 Product information
 - 2 Overview
 - 3 Warnings
 - 4 Unloading from trailer
 - 5 Transport and storage
 - 6 Unpacking
 - 7 Duct connections
 - 8 Internal components
 - 9 Installation
 - 10 Electrical connections
 - 11 Connection of water heating coil
 - 12 Access control system
 - 13 Connect accessories in Control unit CU27-C
 - 14 Dimensions and weight
 - 15 Technical data
 - 16 Additional equipment
 - 17 Disposal
 - 18 EU Declaration of Conformity
 - 19 UK Declaration of Conformity
 
4
| Unloading from trailer
4.2 Using lifting frame
Warning
• Secure the lifting straps on the lifting bars.
• Do not compress the air handling unit's chassi with the lifting straps.
Use a lifting frame connected to lifting bars in the air handling unit's feet.
For size Topvex SC20-Topvex SC35, Topvex TC20–Topvex TC35, place the lifting bars in the outer feet of the air han-
dling unit.
Topvex SC60, Topvex SC70, Topvex TC60, Topvex TC70 are placed in sections on a pallet. Use lifting frame to lift section
by section. Place the lifting bars in the feet.
Attach the lifting straps to the lifting bars.
214958 | A007










