PCA 2 1000D OPERATING INSTRUCTION25055055
Table Of Contents
4 Mounting
•
Before installation remove the device from the packing and 
check for any possible shipping damage!
•
Assemble the device on a clean and stable base. Do not distort 
during assembly! Use the appropriate mounting devices for 
proper installation of the unit!
•
Use the templates printed on the device packing to mark the 
fastening bore holes.
•
The pressure measuring depends on position, therefore the 
mounting must be made vertical and as possible on a vibration-
free place (cable inlet and pressure connections down).
•
The pressure line´s connection should be with plastic-hose (in 
building), inside diameter 4 / 5 mm. For a firm hold of the hose, 
its inside diameter must be 1 mm smaller than the outside 
diameter of the hose nozzle (step spigot 5 / 6 mm).
•
Remove the connection cover for mounting, electrical connec-
tion and setting of the measuring range. Close the lid again 
carefully before start-up (tightening torque of the lid screws 
1.1 Nm). 
•
Two lines may only be fed through one cable screw-type gland 
with the sealing insert for two lines.
Vertical mounting
Gehäuse
housing
111 mm
Gehäuse / housing
106 mm
11 mm
83 mm
91 mm
Schraube 
max 4,5 mm
screw max 
 4,5 mm
Bohrschablone
drilling template
Drilling template on packing
Operating Instructions PCA-2 1000D2 Mounting
L-BAL-E295-GB 1906 Index 001 Part.-No. 
9/48










