User's Manual
Subfloor EZ Node Hardware Installation Guide
Version 1.0
14
pressing the ON/OFF button on the
light pipe once.
b. Ensure the Subfloor EZ Node is
active. The light pipe will display
as green when the node is
activated.
c. Make sure the area where the
Subfloor EZ Node will reside is
clean and free of debris.
3. Finalize hose routing, replace tiling, and clean area.
a. Remove tools and debris from cabinet and subfloor areas.
b. Replace tile over subfloor cavity.