User's Manual
Subfloor EZ Node Hardware Installation Guide
Version 1.0
13
Cabinet and Subfloor Installation
Perform the following steps for a standard installation of a Subfloor EZ Node behind a cabinet.
Note: If an external low-pressure hose is requested, you will need to remove the U-turn and install
the low-pressure hose on the center barb.
1. Prepare and route the diffuser hose.
a. Determine Subfloor EZ Node location (behind
cabinet).
b. Determine necessary length for the high-
pressure hose. The maximum length is 3 feet. If
needed, trim the hose to the appropriate length
using scissors or a utility knife.
c. Attach the hose to the exposed barb using gentle
but firm pressure.
d. Attach the external temperature sensor
to the connector
e. Remove the tile above the subfloor
cavity near the cabinet with a tile puller.
f. Secure the diffuser hose to the stanchion
with a plenum-rated cable tie, with the
diffuser pointed down.
g. Place the temperature sensor in the
subfloor.
Warning: Do not allow diffusers to lay on the subfloor. Position the diffuser on
stanchion a minimum of four inches from the subfloor and four inches from the
underside of the tile floor.
2. Activate, position, and secure the Subfloor EZ Node.
a. Once the hoses are connected,
activate the Subfloor EZ Node by