Installation Guide
5
8. Installation - Shower Valve Trim
2)  Secure large shower escutcheon to Temptrol 
pressure balancing valve using mounting screws. Guide 
handle into control port on valve body (FIGURE 8.2).
3)  Install dome cover by turning clockwise (FIGURE 8.3).
4)  A: Install 'P' handle to shower valve. Secure with
 set screw. Install plug button (FIGURE 8.4).
 B: Install 'PLR' handle to shower valve. Secure with 
set screw (FIGURE 8.4).
FIGURE 8.1
FIGURE 8.2
FIGURE 8.4
A B
9. Installation - Diverter Valve Trim 
2) Install dome cover by turning clockwise (FIGURE 9.2).
1) Secure small diverter escutcheon to Symmons diverter 
valve using mounting screws (FIGURE 9.1).
FIGURE 9.1
FIGURE 9.2
3) Install handle to diverter valve. Secure with set screw 
(FIGURE 9.3).
FIGURE 9.3
1) Attach arm and flange to shower pipe. Turn clockwise 
to tighten (FIGURE 10.1).
2) Install showerhead to shower arm. Turn clockwise to 
tighten (FIGURE 10.2).
3) Install tub spout to stub out pipe. Turn clockwise to 
tighten (FIGURE 10.3).
FIGURE 10.1
FIGURE 10.2
FIGURE 10.3
10. Installation - Showerhead & Tub Spout 
1)  Place diverter/volume control handle into slot in 
shower escutcheon (FIGURE 8.1).
FIGURE 8.3








