Installation Guide
Installation
Caution: Be sure to turn off hot and cold water supplies 
before installing or servicing faucet. 
1. Loosely install the anchor bar (KN-23), spacer (KN-26) and 
nut (L-36) on the mounting bolts and place gasket on base 
of faucet. Push faucet supplies and anchor bolt/spacer/nut 
assemblies with gasket through holes in sink. Secure faucet 
to sink by tightening nuts from underside. (If sink or coun-
ter surface is uneven, use putty or sealant to make proper 
seal under base.) 
2.  Connect hot supply to le tube and cold supply to right 
tube using appropriate connectors. 
3.  Pop-up drain installation:
a) Remove pop-up plug, tail piece and ange from the drain 
body. Make sure that locknut is threaded all the way 
down onto the body with at friction washer in middle 
and beveled washer on top.
b) Apply plumbers putty or sealant to bottom of ange.
c) Install drain body through drain opening in lavatory 
and screw ange onto the drain body making sure that 
the threads are completely engaged for proper sealing 
and strength of the connection. Apply joint compound 
to all threaded parts to insure proper seal. Apply putty or 
teon tape to tail piece before attaching to drain body.
d) Tighten locknut to compress the beveled ange evenly 
across the bottom of the drain opening taking care not to 
over tighten the locknut, causing damage to the lavatory.
e) Remove one of two ball washers from inside the 
threaded cavity. Insert pop-up plug and pivot rod into 
body. Add one ball washer (the second ball washer 
should remain inside the body) to the outside of the ball. 
Tighten the retaining nut until the ball is seated on the 
internal and external ball washers.
  Note: e pop-up plug can be installed either in the remov-
able or non-removable position, depending on the location 
of the hole located in the guide at the bottom of the plug.
f) Slide the pivot rod through one side of the spring clip, 
then the appropriate adjustment hole and then other 
side of the spring clip.
g)  Insert li rod through faucet housing and the top of the 
li strap and secure it in place by tightening the screw.
  Note: To ensure proper operation of li rod and pop-
up, some adjustment of the linkage may be required. 
ere are two possible adjustment points: 1) li strap to 
li rod and 2) li strap to pivot rod.
4.  It is very important to thoroughly ush the supply lines to 
prevent foreign matter, i.e. copper chips, sand, stones, etc. 
from damaging the sealing surfaces of cartridge.
  Remove aerator and turn valve handle on to full cold posi-
tion, open cold supply. Without closing, turn handle to full 
hot and open hot supply. Let water run in hot only and cold 
only positions long enough to ush supply lines thoroughly. 
Shut o faucet and replace aerator. Check for leaks. 
5.  e handle limit stop can be 
set to limit handle turn to 
the hot position. e limit 
mechanism is factory set to 
allow full handle travel. To 
adjust the limit stop, turn 
handle to the full hot position 
and li handle to open faucet 
approximately half way to 
obtain a smooth ow for 
correct initial temperature 
measurement. 
6.  If when faucet is on and in 
full hot position and water is 
too hot, remove plug button 
(KN-157), loosen set screw (L-
22) and remove handle (KN-3RB, KN-3BRB or LN-135). 
Li limit stop ring using a small at head screw driver and 
rotate counter clockwise to lower temperature. If water is 
not hot enough, rotate clockwise (See Figure 1 on reverse 
side). Aer correct temperature is achieved, reattach 
handle, reversing procedure above.
Replacing cartridge (KN-4) 
1.  Remove plug button (KN-157), loosen set screw (L-22) and 
remove handle (KN-3RB, KN-3BRB or LN-135). 
2.  Engage tabs in cartridge wrench (LN-34) with slots in com-
pression ring (KN-2) and use screwdriver in wrench holes or 
pliers on wrench and turn counter clockwise until compres-
sion ring engages with cap (LN-8). Continue turning counter 
clockwise so that cap/ring assembly is removed from the body 
(LN-371). Remove cartridge and three ring seal (KN-4).
3.  Install new cartridge while taking care to maintain position 
of the three ring seal at the base of the cartridge. Match 
posts in base of cartridge with alignment holes in valve 
body during assembly.
4.  Reassemble faucet in reverse fashion. read cap onto body 
rmly by hand. Do not use a wrench which may damage 
the nish. Tighten compression ring (KN-2) nger tight 
using the wrench (LN-34) then 1/4 to 1/2 turn further.
5.  Set hot water limit stop in accordance with installation step 
5 above.
Lavatory Faucet S-20 Series
Installation and Service Instructions
Symmetrix
®
Stop limit adjust
For California Residents
WARNING: is product contains chemicals known to
the State of California to cause cancer, birth defects, or
other reproductive harm.


