Installation Guide

4
1
2
D
E
2) Install dome cover (C) to valve by
turning clockwise.
1
2
C
1) Install shower escutcheon (E) to
shower valve. Secure with two
screws (D).
4) Install tub spout (M) to pipe tting.
Turn clockwise to secure.
1
M
2
5) Remove slide bar ends (H1) from
slide bar anges. Using anges
as a guide, drill 1/8” pilot holes
into studs or wood blocking.
With slide bar (H) in position,
secure to wall using screws (G).
Attach slide bar ends (H1) to bar
anges.
H
3
3
3
G
H1
1
2
Installation
Note:
For valve body installation, please
see valve body manual.
7) Install slide assembly (J) to slide
bar (H). Flat edge on (J2) and (J3)
must be aligned. Arrows on (J2)
and (J4) indicate bottom side.
2
1
5
3
4
J1
H
J3
J4
J2
Note: Slide bar must be secured
with at least two of the three
screws (G) at each end.
3) Install handle (A) to valve. Secure
with set screw (B).
A
1
B
2
Note: Handle should be facing the
6 o’clock position.
6) Disassemble slide assembly (J).
4
3
1
J1
J2
J3
J4
2
Note: Adjust screw cap (J1) for ease
of movement of slide assembly.
8) Press tabs on wall ell ange and
install wall ell (I) to pipe tting.
Turn clockwise to secure.
2
3
I
1
1
9) Attach hand shower (F) to hose (L).
Attach hose (L) to vacuum breaker
(K). Connect vacuum breaker (K) to
wall ell (I). Turn clockwise to tighten.
F
2
L
1
2
I
K
L
3
3