Installation Guide

Symmons Industries, Inc. 31 Brooks Drive Braintree, MA 02184 Phone: (800) 796-6667 Fax: (800) 961-9621
Copyright © 2023 Symmons Industries, Inc. Symmons.com gethelp@symmons.com ZV-3558 REV 0 032723
Shower Trim
Operation and Maintenance Manual
Limited Lifetime - to the original end
purchaser in consumer/residential
installations.
10 Years - for commercial/industrial
installations. Refer to
www.symmons.com/warranty for
complete warranty information.
Warranty
1
Remove Test Cap
Valve Setup
Installation - Setting Limit Stop Screw
WARNING: Failure to adjust limit stop screw properly may result in serious scalding.
1) Turn hot and cold supplies on. Valve will not operate unless both hot and cold water supply pressures are on.
2) Place handle on flow control spindle and open valve to maximum desired temperature.
3) Turn limit stop screw clockwise until it seats.
Installation - Adjust Rotation Resistance
1) Turn hot and cold supplies on. Valve will not operate unless both hot and cold water supply pressures are on.
2) Place handle over flow control spindle.
3) Tighten packing nut for positive frictional resistance as handle is rotated from shut-o position across adjustment range.
Warnings:
1. Test cap for pressure testing up to 200 psi maximum (for water). DO NOT exceed 200 psi while pressure testing valve body.
2. Do not expose valve with test cap to heat for longer than 2 minutes when soldering copper tubing. Doing so may damage the internal compo-
nents of the valve and will void the product warranty.
3. Ensure test cap is re-torqued to 30 lb-ft after soldering valve body.
2
Install Spindle and Cap
Clean finished trim area with a soft cloth using mild
soap and water or a non-abrasive cleaner and then
quickly rinse with water.
Product Care
Installation Instructions
Tools Required:
Packing Nut
Limit Stop
Screw
For rough-in dimensions refer to submittal

Summary of content (4 pages)