User's Manual
Installation Guide 7
2 Hardware Installation
2.1 Installation Instructions
The EMG101 Gateway can attach to a wall or mount under a suspended T-Bar. Select a mounting option based on
the physical environment of the coverage area. Do not mount the EMG101 Gateway in a location not approved in
a site survey.
To prepare for the installation:
1. Verify the contents of the box includes the intended EMG101 Gateway and accessory hardware.
2. Review site survey and network analysis reports to determine the location and mounting position for the
EMG101 Gateway.
3. Connect a CAT-5 or better Ethernet cable to a PoE compatible device and run the cable to the installation
site. Ensure there is sufficient cable slack to perform the installation steps.
4. Determine whether the EMG101 Gateway is powered using a Power Injector system, combining data and
power to the Gateway’s GE1/PoE port or will be powered from a conventional power adapter providing
power only to the Gateway’s DC-48V connector.
2.2 Precautions
Before installing the EMG101 Gateway:
• Verify the intended deployment location is not prone to moisture or dust.
• Verify the environment has a continuous temperature range between 0° C to 50° C.
MN000995A01.fm Page 7 Tuesday, August 26, 2014 2:27 PM










