Integration Guide

Table Of Contents
PSS Software Installation
______________________________________________________________________________
WaveWorks PSS, Integration Guide, 1.10 Page 31
© 2000, Symbol Technologies, Inc. February 1, 2000
- In Starting At, change the time to 1:55am (or 5 minutes before backups will
be scheduled to start below).
- Press OK.
- Press OK.
- Press OK.
4.9.4 Configure the Extensive Database Check and Backup job
This step will configure a database backup, and an extensive check of the integrity of all of the
structures in the database, including tables and table indexes, which will run once a week. The
integrity check takes a relatively long time because the structure of all of the table indexes must
be verified, and because of this, this activity must be scheduled for the time of the week with the
least shopping activity.
- Under ‘Management’, click on ‘Database Maintenance Plans’.
- In the right pane, right-click, and select ‘New Maintenance Plan...’, and the Database
Maintenance Plan Wizard should appear. Click “Next.”
- This maintenance plan will include an exhaustive optimization and validation of the
database, as well as a backup. It should run once a week when the system is unused, or
lightly used. The default schedule for these activities is Sunday in the early morning
hours. You should change this schedule only if necessary.
- On the Select Databases page, make sure ‘These databases’ is selected, and check the box
next to the PSS database name. Click ‘Next’.
- On the ‘Update Data Optimization Information’ page, click on ‘Reorganize data and
index pages’, and click on ‘Remove unused space from database files’.
- This operation may take some time, and slow down the system, so if you have a
reason to use a different schedule, then next to ‘Schedule’ press the ‘Change’ button,
and make the appropriate changes.
- Click ‘Next’.
- On the ‘Database Integrity Check’ page, click on ‘Check database integrity’. Click on
‘Perform these tests before doing backups’.
- If you have a reason to use a different schedule, you can change it by pressing the
‘Change’ button next to ‘Schedule’. Make any changes, and press ‘OK”.