Installation Instructions

Mechanical and hydraulic installation Page 14/24
Installation and commissioning instructions
Flow adjustment
screws
Purge
décha
Outlet
Mounting kit 1"/1/4
Inlet
2) Installation in the probe housing
The CAA320X et CAA330X probes ares installed in the SYCLOPE measuring chambers (modular type
BMT or BMT block) whose dimensions allow the installation of standard 1” probes. Hydraulic connections
are made using PE flexible tubes or compatible connections.
Inlet
Flow adjustment
screws
Outlet
Purge
décha
Mounting kit 1"/1/4
Step 1
Overview
BMP modular chambers
BMT measurement block
Mounting kit + ring
Parts of the kit to be
inserted below the probe
ring.
Part of the kit to be
inserted above the probe
ring for tightening and
sealing
Ring
Tope of probe
body
Position from the top of
the probe the kit elements
to be inserted before the
probe ring.
Parts of the kit to be
inserted above the probe
ring for tightening and
sealing
Parts of the kit to be
inserted below the probe
ring.
Ring
Tope of probe
body
Position from the top of
the probe the
kit elements
to be inserted before the
probe ring.