Installation Instructions
General use Page 17/67
Installation and starting instructions
5) Tightening torque
a) Cable gland
b) Terminal blocks
The tightening torque of the screws of different terminal block is 0.5 N.m
6) Electrical connections
Electrical installations must be carried out in accordance with the standards in force and by
authorized personnel!
A 30-mA differential circuit breaker must be installed!
A 10A circuit breaker must be installed near the device and easily accessible in order to cut the
primary supply. It must be marked as the cut-off circuit of the device.
Before making the connections, cut off the power supplies!
Preferably use single-strand cables
Otherwise, it is essential to use a crimped cable ends to ensure that no strand can come into
contact with neighbouring cables!
Secure the wire connections on the terminal blocks using a cable tie.
SYCLOPE ODITouch
®
must be slaved to the filtration of the swimming pool using digital
input.
Internal protection :
SYCLOPE ODITouch
®
is protected by two resettable fuses (see table “General
characteristics” page 14) and by a varistor against overvoltage of 275V.
The self-powered power relay outputs PO1 and PO2 are each protected by a TR5 fuse (see
table “General characteristics” page 14).
Max cable section via
cable gland.
3 x (2-5mm) 1 x (6-12mm)
Cable gland
tightening torque.
0.7 N.m 2 N.m