Installation Instructions
Commissioning the Syclope COOLTOUCH Page 33/57
Installation and starting instructions
VI. Commissioning the SYCLOPE COOLTouch
®
You have just made the electrical connections and the connections of the various measurement and
regulation devices. You are ready to realize the commissioning of your SYCLOPE COOLTouch
®
.
Switch ON the device.
Check that everything is good, your control panel is switched ON and other elements
of your installation haven’t been disturbed.
SYCLOPE COOLTouch
®
regulator doesn’t automatically start the treatment and dosing of
chemical product when you switch ON. Only the user can initiate the treatment after ensuring
that the control unit is properly programmed according to his needs.
SYCLOPE COOLTouch
®
regulator is fully configurable. When you switch ON, the predefined
measured parameters are displayed and the regulation processes are inactive.
SYCLOPE COOLTouch
®
regulator is delivered with standard programming. The user should
modify this programming is it doesn’t correspond with his needs. To modify the programming
of your controller, please refer to the following chapter.