Installation Guide

1. Please adhere to the following installation
instructions. We shall not be responsible for failures
and loss that are contributed to improper installation.
2. Please confirm the fixation location of frame prior
to installation and obtain the finished floor surface.
Draw FEL on installation wall and follow it as
baseline from ZERO (0) level.
3. The instructions have been composed based in the
latest product specifications. We reserve the right to
make modifications to the packaging and
specifications without providing prior notification.
Important instruction:
NOTES:
1. Mount before bricks building.
2. All size unit in MM.
3. Follow the material product, should there is an
unconformity with drawing.
Finished Floor.
=FINISHED FLOOR
FFL
Drainage System 1
Mounting wall
Mounting frame
FFL
When the drain pipe locates on A position, the
distance from centre of drain pipe to installation
wall (W1) should be 70-100.When the drain pipe
locates on B position, the distance from centre of
drain pipe to installation wall (W1) should be 70-80.
1 Drainage System Layout
Drawing 1 to 3 are three different installation systems
for drain pipe. Customer should confirm whichever
installation system according to drainage outlet
position. If drainage outlet does not fall within the
three systems, customer should follow one of three
drainage system layout to correspond installation of
our concealed cistern.
Drainage System 2
Mounting wall
Mounting wall
Mounting frame
Mounting frame
Drainage System 3
FFLFFL
When the drain pipe locates on A position, the
distance from centre of drain pipe to installation
wall (W1) should be 70-100.When the drain pipe
locates on B position, the distance from centre of
drain pipe to installation wall (W1) should be 70-80.
When the drain pipe locates on A position, the
distance from centre of drain pipe to installation
wall (W1) should be 70-100.When the drain pipe
locates on B position, the distance from centre of
drain pipe to installation wall (W1) should be 70-80.
9 Mounting of ceramic bowl
Draw the lines as above picture.
Fully insert the straight tube into
cistern flushing outlet and connecting pipe
into discharging outlet.
Apply lubricant on rubber washers of
straight tube and connecting pipe,
then insert into ceramic holes.
Draw the lines as above picture.
As per drawing,
L1 is distance between the two lines on
straight tube.
L2 is distance between the two lines on
connecting pipe.
Cut the straight tube and connecting
pipe as per above drawing.
Polishing the cutting surface to get
chamfer angle as per drawing and deburring
Apply lubricat on joint surface of straight
tube and connecting pipe
Adjust length of connecting bolt to be d+20mm
Firstly insert connecting pipe into discharging
outlet and straight tube into ceramic hole
Mounting the ceramic bowl.
Locking the ceramic bowl.
3
8