Installation Guide

Installing the Toilet.
1. 2. 3.
4. 5. 6.
7. 8. 9.
10.
L2
L1
L1+15/16”
L2
L2+1/8”
L1
depth
depth + 1”
12.11.
8
· Install pipes. Be sure to seal them thoroughly.
· With a ruler, against the back of the bowl, on
top of pipe, mark as shown.
· After cutting, take file and remove all burrs.
Try and bevel edge.
· Before mounting bowl, measure thickness of
china and mounting hardware to get
approximate depth of threaded rods.
· Use slotted end of thread bolt to adjust in or
out. Do not damage the thread.
· Install with mounting hardware and ensure
toilet bowl is level.
· With grease, sponge thoroughly to
lubricate all ends.
· Measure distance between both lines on
pipes. Take measured distance, deduct from
bald end of pipe and cut.
· With a ruler, against finished wall, on top of
pipe, mark as shown.
· Remove pipes from wall and install into back
of bowl. Make sure pipes are sealed
thoroughly.
WALL-HUNG CARRIER SYSTEM INSTALLATION INSTRUCTIONS