Installation Guide
— 4 —
6. 7. 8.
9. 10. 11.
*coupler not included, please
consult your local plumber.
Depending
on your
installation
it will either
be a 4” x 3”
or a 3” x 3”
mechanical
coupling.
· Cover installation bolts with protective slip, do not
remove slip until after toilet is in place. It is
important to keep threads clean for later
adjustment.
· Ensure template is plumb.
· Install dry wall over carrier system
in intended location.
· Find cutout template that was included with
your carrier.
· Cut out the small marked holes (1) to align
cutout with the threaded bolts.
· Align template up on your wall so the threaded
bolts fit through the precut holes.
· Cut around the marked lines (2) to reveal
pipe/actuator locations behind the drywall.
WALL-HUNG CARRIER SYSTEM INSTALLATION INSTRUCTIONS










