Installation Guide

CONCEALED TANK SYSTEM INSTALLATION
5
7. 8.
9. 10. 11.
1
2
1
1
Install dry wall over carrier system in
intended location.
Cover installation bolts with protective slip, do not remove slip until
after toilet is in place.
• Find Cut-out template that was included
with your carrier.
• Cut out the small marked holes (1) to
align cutout with threaded bolts.
• Align template up on your wall so the
threaded bolts fit through the previously
cut holes.
• Cut around the marked lines (2) to reveal
pipe/ actuator locations behind the drywall.
2
2
2