Full Product Manual
1. Construct Frame
· Build framing according to the size of your tub.
· When building frame, keep in mind access to drain
connections and faucet location, an access panel
may be needed depending on location.
· A mixing valve may be required, check with your
local plumbing codes.
— 2 —
2. Rough-In
· Rough plumbing must be installed before
installing the bathtub.
· Floor and drain trap are not included, make sure
to install according to local and legal regulations.
· Do not connect drain to plumbing yet.
3. Lay Plastic Film
· Lay plastic film on sub floors to prevent water
from being absorbed.
· Depending on drain location (right or left), a
6” x 12” rough opening should be cut in the floor
for later hookup.
4. Drop Tub into Frame
· If tile or stone is to go on deck surface, this must
be done before installing bathtub, consult with a
professional if necessary.
· Carefully lift the bathtub and slowly drop into
place.
· Ensure tub is level on all sides. Check everything
thoroughly and adjust as needed.
DROP-IN BATHTUB INSTALLATION INSTRUCTIONS
Plastic
Film
6”
12”