Instructions / Assembly

1. Rough-In
· Rough plumbing must be pre-installed by a
certified plumber before installation.
· If floor drain-hole installation is needed, contact a
certified plumber.
· Place tub at final desired location and verify floor
drain and bathtub drain align.
Studs must be
flush and square
2
2. Position Tub
· Do not install the product with any air gaps under
the bottom support or product damage will occur.
· If installation surface is not level, use leveling
compound or mortar bed for proper installation.
· To ensure base is installed correctly, entire bottom
support must contact a flat, level surface.
· Adjust legs to ensure tub is level with floor.
· A customized front apron is needed to complete
the project.
Bottom
support
Wall
Wall studs
6” x 12”
Rough
cutout
Rough-in
W
L
6”
12”
3-SIDED INTEGRAL FLANGE BATHTUB INSTALLATION INSTRUCTIONS